Quick Answer: An oversize load permit is required any time cargo exceeds 8 feet 6 inches (102") wide, 13'6" to 14'6" high depending on the state, 53 feet long in most states, or 80,000 pounds gross weight on US highways. Each state issues its own permit, so a five-state haul needs five separate permits before the truck rolls.
- Legal limits are 8'6" wide, 13'6" to 14'6" high depending on the state, 53' trailer length in most states (up to 60') and 80,000 lbs gross — exceed any one and you need an oversize load permit.
- Permits are issued state by state, not federally. A Houston-to-Laredo move needs one permit; Chicago to Savannah can need five or more.
- Single-trip permits often clear same day; superload permits with bridge analysis take 2–6 weeks.
- The first escort car is required from 12' to 16'7" wide depending on the state (most at 12'–14'); Texas adds a height pole over 17'.
Most shippers discover the problem after the machine is already loaded. A 13'2" excavator on a 36" deck height measures 16'2" overall — a different permit class, a different route, and often a police escort. Enter the loaded dimensions, the cargo and the states on your route in the checker above to see whether you need a permit, which trailer fits and what escorts each state requires.
Get a quote for your shipment
Tell us what you need to ship, and an advisor replies with your quote within one business day.
Request a quote →What Is an Oversize Load Permit?
Quick Answer: An oversize load permit is a state-issued authorization that lets a truck legally haul cargo exceeding standard size or weight limits on public roads. It names the exact vehicle, dimensions, route, travel dates and escort requirements. Without it, the load is illegal the moment it leaves private property.
The permit is tied to one truck, one route and one date window. Change the trailer, change the route, or miss the date window and the permit is void. Enforcement officers check all three at weigh stations.
The industry calls these OS/OW permits — oversize and overweight. The two are different problems:
- Oversize means the load breaks a dimension limit: width, height, length or overhang.
- Overweight means the load breaks a gross weight or axle weight limit, even at legal dimensions.
- A loaded transformer or press brake is often both at once, which stacks two sets of fees and restrictions.
The Federal Highway Administration sets size and weight limits on the Interstate System and the National Network. The FHWA oversize/overweight permit program documents how states administer the exceptions. Everything else — fees, routing, escorts, curfews — belongs to the states.
State DOTs issue permits through their own portals: TxDMV oversize/overweight permits in Texas, Caltrans transportation permits in California, and IDOT oversize and overweight permits in Illinois. Florida uses FDOT OSOW, Georgia uses GDOT.
Pro Tip
A permit does not waive liability. It only defines the conditions under which the move is legal. If you strike a bridge on an approved route, the permit does not protect you — but moving off the approved route almost guarantees your insurer denies the claim. AB Group Shipping arranges permitted project cargo, breakbulk and heavy-haul from any origin in the USA or Canada.
What Size Load Requires an Oversize Permit?
Quick Answer: A load requires an oversize permit if it exceeds 8 feet 6 inches (102 inches) wide, 13'6" to 14'6" tall depending on the state, 53 feet of trailer length in most states, or 80,000 pounds gross vehicle weight. Axle limits also apply: 20,000 lbs single, 34,000 lbs tandem under the Federal Bridge Formula.
Those four numbers answer what is considered an oversize load in most of the country. Overhang rules add a fifth trigger: generally 4 feet behind the trailer and 3 feet in front.
Federal legal limits vs. permit triggers
| Dimension | Legal maximum | Permit required above |
|---|---|---|
| Width | 8'6" (102") | 102" |
| Height | 13'6" in 26 states, 14' in 20, 14'6" in Colorado and Nebraska | 13'6"–14'6" by state |
| Trailer length | 53' in most states, up to 60' | 53'–60' by state |
| Rear overhang | 4' | 4' |
| Gross weight | 80,000 lbs | 80,000 lbs |
| Single axle | 20,000 lbs | 20,000 lbs |
| Tandem axle | 34,000 lbs | 34,000 lbs |
Source: FHWA federal size and weight limits, National Network · 2026
How the Federal Bridge Formula works
Legal weight depends on axle spacing, not just total pounds. The Federal Bridge Formula limits how much weight you can concentrate over a short distance. Spread your axles farther apart and you can legally carry more.
That is why heavy-haul carriers run multi-axle RGN and double-drop trailers. A 9-axle configuration can move 120,000 lbs on permit where a standard 5-axle setup is illegal at 85,000.
Loads that trigger permits without warning
- Excavators and dozers with tracks over 102 inches — common from 20-ton class up.
- Boats on trailers: beam over 8'6" is standard on most cruisers.
- Lifted trucks, RVs and crane bodies exceeding the state's legal height (13'6" to 14'6") when loaded.
- Transformers, silos, tanks and modular building sections.
- 40' flat-rack cargo with side overhang moving to the port.
A superload is the next tier up. Thresholds vary by state, but the common triggers are over 16 feet wide, 16 feet high, 150,000 lbs, or 120 feet long. Superloads force engineering review.
Anything wider than 102 inches needs a wide load permit in all 50 states. It is the most commonly broken limit in machinery, boat and export cargo moves.
If the oversize item is a wheeled vehicle heading overseas, the shipping method changes the permit picture. Our RoRo vs Container Car Calculator: 2026 Rates breaks down which method fits oversized wheeled equipment.
Get a quote for your shipment
Tell us what you need to ship, and an advisor replies with your quote within one business day.
Request a quote →Which Oversize Load Permit Type Do You Need?
Quick Answer: Four permit types cover almost every move: single-trip, annual or blanket, superload, and continuous travel. Single-trip permits fit one-off machinery hauls. Annual permits suit carriers running the same oversize equipment weekly. Superload permits apply to anything needing engineering review and bridge analysis.
| Permit type | Validity | Lead time | Best use case |
|---|---|---|---|
| Single-trip | 3–10 days | Same day–3 days | One-time machinery or project cargo move |
| Annual / blanket | 12 months | 1–2 weeks | Carriers repeating the same oversize runs |
| Superload | Single move, dated | Weeks | Over 16' wide/high or 150,000 lbs |
| Continuous travel | Per move, 24/7 travel | 2–5 days | Time-critical loads cleared for night movement |
Permit fees vary by state, weight and miles, so the cost of each permit type depends on your load and route. The checker above shows whether your dimensions need a permit and which trailer fits — flatbed (about 5' deck), step deck (about 3'4"), RGN/double drop (about 2'), multi-axle or specialized.
Single-trip permit
Route-specific and date-specific. Valid roughly 3 to 10 days depending on the state. This is the default for project cargo, one-time machinery hauls and export moves to the port. The state approves an exact routing, and you cannot deviate from it.
Annual / blanket permit
Covers 12 months within a fixed dimension envelope, usually up to 12' wide and 14'6" high. Many states limit blanket permits to self-propelled or empty equipment. It saves filing time but rarely covers overweight.
Superload permits trigger structural engineering review. The state runs a bridge analysis on every structure along the route. Utility line surveys get added when height exceeds roughly 16 feet.
Continuous travel and trip-and-fuel permits matter for non-apportioned trucks. If the carrier is not registered under IRP, a trip permit covers the state entry; fuel permits cover the IFTA gap. Both are separate from the OS/OW permit.
An annual permit is not a weight permit
In Pennsylvania, Virginia and Illinois, an annual oversize permit often covers dimensions only. Overweight needs its own authorization, sometimes with separate bridge review. Carriers assume one permit covers both and get cited at the first scale.
Get a quote for your shipment
Tell us what you need to ship, and an advisor replies with your quote within one business day.
Request a quote →Do I Need a Permit in Every State for an Oversize Load?
Quick Answer: Yes. Oversize permits are issued state by state, and you need one from every state your route crosses, including states you only pass through. There is no national oversize load permit. A Chicago to Savannah haul crossing Indiana, Kentucky, Tennessee and Georgia requires five separate permits.
Sequencing is where multi-state moves fail. Each permit has a validity window of only a few days. You work backward from the delivery date and align the start dates so every window overlaps the day the truck is in that state.
A Houston to Chicago transformer move needs permits from Texas, Oklahoma, Missouri and Illinois. Each has its own fee, approved route, validity window and escort rule. The routings do not always connect cleanly at the state line.
Oversize permits by state: quick reference
The full table of every state's legal height and escort thresholds is further down the page, and the checker above applies them to your own route.
Permit fees vary by state, weight and miles, so verify current figures in each state portal before you budget.
Note the height split. Legal height is 13'6" in 26 states, 14' in 20, and 14'6" in Colorado and Nebraska. A 13'9" load can run permit-free through a 14' state, then needs permits and routing review the moment it enters a 13'6" state.
Toll and bridge authorities issue their own permits on top of the state permit. The Pennsylvania Turnpike, Ohio Turnpike and Port Authority of New York and New Jersey crossings all require separate authorization.
The expired-permit trap
A delay at origin pushes the truck two days late into leg three. The Tennessee permit expires while the trailer sits. The driver cannot legally move, you pay layover, and you re-file at full price. Build 48 hours of slack into every validity window on multi-state routes.
When Do I Need a Pilot Car for an Oversize Load?
Quick Answer: The first escort car is required from 12 feet to 16 feet 7 inches wide depending on the state, most at 12 to 14 feet. Texas requires one escort over 14 feet, front and rear over 16 feet and a height pole over 17 feet; Florida requires front and rear escorts from 14 feet wide.
A pilot car — also called an escort vehicle — runs ahead of or behind the load. It carries a roof-mounted OVERSIZE LOAD sign, flags, amber lights and two-way radio. The front car scouts clearances and warns oncoming traffic.
Pilot car requirements by load width
See the data
| Requirement | Typical trigger width (ft) |
|---|---|
| One escort, two-lane road | 12 |
| One escort, multi-lane highway | 14 |
| Front and rear escorts | 15 |
| Police escort | 16 |
Source: composite of state DOT escort rules (TX, CA, FL, GA, IL, PA) · 2026
Height and length trigger escorts too. Height pole vehicle rules vary by state — Texas requires one over 17'. Overall length past 90 to 110 feet adds a rear escort in most states. The checker above lists the escort cars, height pole and travel rules for each state on your route.
Escort certification is not universal
Florida, Colorado, Washington, Virginia and Pennsylvania require state-certified escort drivers. Texas requires an escort certificate. Many states accept reciprocity, but not all do. Booking an uncertified escort voids your compliance at the state line.
Marking and signage rules
- OVERSIZE LOAD banner: 7 feet by 18 inches, black on yellow.
- 18-inch square red or orange flags on all four corners and every extremity.
- Amber rotating or strobe lights on the tractor and escort vehicles.
- Red flags by day and lamps at night on any rear overhang beyond 4 feet.
Pro Tip
Book escorts before you file the wide load permit, not after. In peak construction season, certified pilot car operators on corridors like I-10 and I-75 book out 5 to 7 days. The permit arrives same day; the escort is what delays your move.
How Much Does an Oversize Load Permit Cost?
Quick Answer: State permit fees are usually the smallest line on an oversize move. They vary by state, weight and miles, and superloads add engineering review on top. Escorts, route surveys, bridge analysis and utility line lifts drive the real total, often several times the permit fees combined.
| Cost item | Notes |
|---|---|
| Single-trip state permit | Varies by state, weight and miles |
| Annual / blanket permit | 12 months, fixed dimension envelope |
| Superload permit | Plus engineering review charges |
| Pilot car | Day-rate minimums usually apply |
| Height pole vehicle | Added to the pilot car cost |
| Police escort | Often 4-hour minimum, paid to the jurisdiction |
| Route survey | Required on most superloads |
| Bridge analysis | State engineering or approved third party |
| Utility line lift | Per crossing, coordinated with the utility |
Permit fees vary by state, weight and miles. Several states charge per mile or per ton over the limit instead of a flat fee. Overweight fees in those states climb fast on long hauls.
On a typical three-state wide load, escort and survey costs commonly run five to ten times the combined state permit fees. Budget for the escorts first.
What drives your total move cost: origin and export gateway, loaded dimensions, route length, number of states crossed, escort count, whether bridge analysis triggers, and trailer type — step deck, RGN, double-drop or multi-axle.
Your gateway depends on where the load starts. Florida ships through PortMiami. Texas and the central states move through Port Houston. California and the Southwest use Los Angeles/Long Beach. The Northeast uses New York/New Jersey, the Southeast uses Savannah, the Midwest railheads through Chicago. Ontario goes through Toronto, Quebec through Montreal, Western Canada through Vancouver.
Get a quote for your shipment
Tell us what you need to ship, and an advisor replies with your quote within one business day.
Request a quote →How Long Does It Take to Get an Oversize Load Permit?
Quick Answer: Routine single-trip permits are often issued the same day through state online portals, sometimes within minutes. Permits needing manual routing review take 1 to 3 business days. Superload permits requiring structural engineering and bridge analysis take 2 to 6 weeks, and longer during peak construction season.
| Permit scenario | Processing time | File this far ahead |
|---|---|---|
| Auto-issued single trip (within envelope) | Minutes–same day | 2–3 business days |
| Manual routing review | 1–3 business days | 5 business days |
| Superload engineering review | 2–4 weeks | 30 days |
| Bridge analysis required | 3–6 weeks | 45 days |
| Utility line coordination | 4–8 weeks | 60 days |
Plan backward from the port gate cut-off, not the vessel ETD. Those are different dates. Cargo cut-off at PortMiami or Port Houston typically falls 2 to 4 days before the vessel sails. A late permit misses the sailing, not just the gate.
Travel restrictions shrink your window
- Daylight-only movement applies to most oversize loads, Monday through Friday.
- Metro rush-hour curfews block Houston, Atlanta, Chicago and Los Angeles corridors twice daily.
- Many states ban oversize travel from noon Friday or Saturday through Monday for loads over set widths.
- Holiday bans cover Memorial Day, July 4th, Labor Day, Thanksgiving and Christmas weekends.
- Wind and ice restrictions stop high-profile loads with no notice.
Practical filing rule
File routine permits 3 to 5 business days out. File superloads 30 to 45 days out. During peak construction season (May to September), add a week to every estimate — state permit offices queue behind road work reviews.
How Do You Apply for an Oversize Load Permit, Step by Step?
Quick Answer: Applying takes six steps: measure the loaded dimensions, identify every state on the route, gather carrier and insurance data, file through each state portal, pay the fees, then book escorts and confirm the routing. Most states issue a PDF permit that must ride in the cab.
- Measure the exact loaded width, height, length, gross weight and axle weights. Measure height from pavement to highest point.
- Build the route and list every state, toll authority and bridge structure you cross.
- Collect the USDOT number, MC number, VIN, plate, insurance certificate and axle spacing diagram.
- File in each state portal with the load drawing and dimensions.
- Pay the fees and download every permit PDF for the cab.
- Book certified escorts and brief the driver on curfews, approved routing and restricted hours.
Documents every portal asks for
- Load drawing or photo with marked dimensions
- Axle spacing chart and per-axle weights
- Cargo description and trailer type
- Origin and destination addresses, with travel dates
- Carrier insurance certificate and USDOT/MC numbers
Hauling without a permit
Fines are set by each state and can reach thousands of dollars per violation. Add load impoundment, an out-of-service order and CSA points against the carrier. Overweight penalties often scale per pound over the limit. If a bridge strike happens on an unpermitted move, your insurer can deny the claim — and bridge repair liability runs into six figures.
How Do Oversize Loads Move Through Ports and Across Borders?
Quick Answer: Oversize cargo headed overseas needs road permits to the terminal plus terminal-side clearance for the handoff. Flat racks, open tops, breakbulk and RoRo each have different gate and lashing limits, and drayage from inland origins usually needs its own permit set separate from the export booking.
Terminal gates enforce their own height and width limits. Out-of-gauge cargo usually needs a gate appointment and a terminal-side survey before the drayage move. Showing up unannounced with a 14-foot-wide crate gets the truck turned away.
Equipment choice drives the permit scope
- 40' flat rack — in-gauge up to about 8'6" wide; side overhang pushes you into out-of-gauge rates.
- Open top — for over-height cargo loaded from above, with tarp and lashing requirements.
- Breakbulk / lift-on — for anything beyond flat-rack capacity, booked against vessel gear limits.
- RoRo on a mafi trailer — best for wheeled and tracked machinery that can roll or be towed aboard.
Typical export lanes we move permitted cargo on: Houston to Puerto Cortés, Los Angeles to Acajutla, New York to Caucedo, Miami to Cartagena, Savannah to Santos, Toronto to Kingston, and Vancouver to Callao.
Cross-border permitting
Canada issues permits at the provincial level — Ontario MTO, Quebec and BC each run separate systems, with CBSA clearance at the border gate. Mexico uses SCT permits with SAT clearance. Colombia requires DIAN documentation plus a Manifiesto de Carga for the inland leg.
EXW and FCA
Permitting and road risk sit with the buyer once cargo leaves your dock or clears origin terminal. Clean liability split for project cargo.
DAP and DDP
Permitting, import clearance and inland escorts fall back on the seller. DDP on oversize cargo is risky — you take on foreign road permits and duty exposure you cannot control from the US.
Who should file your permits?
| Approach | Speed | Compliance risk | Best fit |
|---|---|---|---|
| Self-filing | Slow on first attempt | High | Single-state, repeat moves |
| Permit service | Fast | Medium | Carriers with in-house dispatch |
| Forwarder-managed | Fast | Low | Export and multi-state project cargo |
For wheeled oversize cargo, the shipping method decides everything downstream — see RoRo vs Container Car Calculator: 2026 Rates. For vehicle-based cargo on specific lanes, review our Car Shipping Calculator: Miami to Colombia Rates & Costs 2026 and Miami to Ecuador: Car Shipping Costs.
Destination clearance rules vary sharply. Check the Car Import Requirements Panama: Complete Documentation Checklist for US Vehicles and the Car Shipping Calculator Dominican Republic 2026 before you book.
Get a quote for your shipment
Tell us what you need to ship, and an advisor replies with your quote within one business day.
Request a quote →Measure the load first, map the states second, book escorts third. Then use the request form on this page to send us the numbers — we confirm permits, routing and carrier space, and return one exact price within one business day.
Oversize load rules by state
In all 48 lower states a load wider than 8′6″ needs a permit. Legal height runs from 13′6″ to 14′6″ depending on the state, measured from the road with the trailer. The table shows the size at which each state starts asking for escort cars.
| State | Legal height | Escort car from (width) | Front and rear from | Height pole from | Escort from (length) | Weekend moves |
|---|---|---|---|---|---|---|
| Alabama | 13′6″ | 12′1″ | — | 15′7″ | 90′ | No |
| Arizona | 14′ | 14′1″ | 14′ | — | — | Limited |
| Arkansas | 14′ | 14′1″ | 14′ | 15′1″ | 100′ | Yes |
| California | 14′ | 12′1″ | — | — | 120′ | Limited |
| Colorado | 14′6″ | 15′1″ | — | 16′1″ | 115′ | Limited |
| Connecticut | 13′6″ | 12′1″ | — | 14′1″ | 100′ | Limited |
| Delaware | 13′6″ | 13′1″ | 14′ | 15′ | 90′ | Limited |
| Florida | 13′6″ | 12′1″ | 14′1″ | 14′7″ | 95′ | Limited |
| Georgia | 13′6″ | 12′1″ | 14′9″ | 15′6″ | 75′ | No |
| Idaho | 14′ | 15′1″ | 10′ | 16′1″ | — | Limited |
| Illinois | 13′6″ | 14′7″ | — | 14′7″ | 110′ | Limited |
| Indiana | 13′6″ | 12′5″ | 14′4″ | 14′7″ | 110′ | Limited |
| Iowa | 13′6″ | 12′1″ | — | 14′7″ | 120′ | Yes |
| Kansas | 14′ | 16′7″ | — | 16′1″ | 126′ | Yes |
| Kentucky | 13′6″ | 12′1″ | 14′ | 15′ | 110′ | Yes |
| Louisiana | 14′ | 12′1″ | — | 16′9″ | 90′ | Yes |
| Maine | 14′ | 12′1″ | — | 15′1″ | 80′ | Limited |
| Maryland | 13′6″ | 13′1″ | — | 14′6″ | 85′ | Limited |
| Massachusetts | 13′6″ | 12′1″ | 13′6″ | 13′10″ | 90′ | Limited |
| Michigan | 13′6″ | 12′1″ | 14′ | 14′7″ | 100′ | Limited |
| Minnesota | 13′6″ | 15′1″ | — | — | 110′ | Limited |
| Mississippi | 13′6″ | 13′ | — | 15′7″ | 99′ | Yes |
| Missouri | 14′ | 12′7″ | 14′ | 15′7″ | 125′ | Limited |
| Montana | 14′ | 16′7″ | — | 17′1″ | — | Limited |
| Nebraska | 14′6″ | 12′ | 16′ | 16′ | 125′ | Yes |
| Nevada | 14′ | 14′1″ | 14′ | 15′7″ | 110′ | No |
| New Hampshire | 13′6″ | 12′ | — | 14′1″ | 90′ | No |
| New Jersey | 13′6″ | 14′1″ | 16′ | — | 100′ | Yes |
| New Mexico | 14′ | 14′ | 18′ | — | 110′ | Yes |
| New York | 13′6″ | 12′1″ | — | 14′ | 80′ | Limited |
| North Carolina | 14′ | 12′1″ | — | 14′6″ | 110′ | Yes |
| North Dakota | 14′ | 16′1″ | 16′1″ | 18′1″ | 120′ | Limited |
| Ohio | 13′6″ | 13′1″ | — | 14′7″ | 90′ | Limited |
| Oklahoma | 14′ | 12′1″ | — | 15′9″ | — | Yes |
| Oregon | 14′ | 14′1″ | 16′ | 14′7″ | 120′ | Limited |
| Pennsylvania | 13′6″ | 13′1″ | — | 14′7″ | 90′ | Limited |
| Rhode Island | 13′6″ | 12′ | 14′6″ | 13′7″ | 80′ | No |
| South Carolina | 13′6″ | 14′1″ | 16′ | 16′ | 125′ | Limited |
| South Dakota | 14′ | 16′1″ | — | — | 130′ | Yes |
| Tennessee | 13′6″ | 12′7″ | 13′7″ | 15′1″ | 90′ | Yes |
| Texas | 14′ | 14′1″ | 16′1″ | 17′1″ | 110′ | Yes |
| Utah | 14′ | 14′1″ | — | 16′1″ | 120′ | Yes |
| Vermont | 13′6″ | 12′ | — | — | 80′ | Limited |
| Virginia | 13′6″ | 12′1″ | — | 14′6″ | 120′ | Yes |
| Washington | 14′ | 14′1″ | — | 14′7″ | 125′ | Yes |
| West Virginia | 13′6″ | 12′1″ | — | 15′1″ | 95′ | Limited |
| Wisconsin | 13′6″ | 15′1″ | 20′1″ | 16′1″ | 140′ | Limited |
| Wyoming | 14′ | 15′ | — | 17′1″ | 150′ | Yes |
Source: each state DOT's oversize/overweight permit rules, compiled October 2026. The exact escort count depends on the road; each state's permit office has the final say.
A load requires an oversize permit once it exceeds 8 feet 6 inches (102 inches) wide, the state's legal height, the trailer length limit (53 feet in most states, up to 60 feet), or 80,000 pounds gross weight. Legal height is 13 feet 6 inches in 26 states, 14 feet in 20, and 14 feet 6 inches in Colorado and Nebraska, so the trigger point changes by state. Axle weight matters too: exceeding 20,000 lbs on a single axle or 34,000 lbs on a tandem requires an overweight permit even at legal gross weight.
Permit fees vary by state, weight and miles, so there is no single national price, and superload permits add engineering review on top. The permits themselves are rarely the biggest cost — pilot cars, police escorts, route surveys and utility line lifts usually add far more. Enter your dimensions and route in the checker above to see what each state requires, then send them through the request form and a specialist returns the exact all-in price within one business day.
Yes. There is no federal oversize load permit, so you must obtain one from every state your route crosses, including states you only drive through. A move from Chicago to Savannah crossing Indiana, Kentucky, Tennessee and Georgia needs five separate permits with overlapping validity dates. Toll authorities such as the Pennsylvania Turnpike and the Port Authority of New York and New Jersey issue additional permits of their own.
The first pilot car is required from 12 feet to 16 feet 7 inches wide depending on the state, with most states between 12 and 14 feet. Texas requires one escort over 14 feet wide, front and rear escorts over 16 feet, and a height pole over 17 feet tall; Florida requires front and rear escorts from 14 feet wide. Florida, Colorado, Washington, Virginia and Pennsylvania require state-certified escort drivers, so verify certification before booking.
Routine single-trip permits are often auto-issued the same day through state online portals, sometimes within minutes. Permits needing manual routing review take one to three business days. Superload permits requiring structural engineering and bridge analysis take two to six weeks, so file those 30 to 45 days before your planned move date.
You face fines set by each state that can reach thousands of dollars per violation, plus load impoundment and an out-of-service order that strands the truck roadside. Overweight penalties often scale by the pound over the limit, and CSA safety points follow the carrier. Worst case, your insurer can deny a damage or bridge-strike claim because the move was illegal.